• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name paschke

    Log entry time 11:47:10 on March 2,2006

    Entry number 164763

    keyword=Hall A IA calibrated

    
    I calibrated the Hall A IA cell, which was a necessary step for commissioning 
    feedback.  The S2 picomotor was tweaked to increase the dynamic range, which 
    should be of use when Hall C turns on.
    
    The measured slope is 393 ppm/Volt (measured in bcm4).  A current scan should 
    be performed to set the pedestal of this bcm sometime (and then this slope 
    should be recalibrated from this run).
    
    Run 7044  - test before S2 tweak.  Ended after S2 tweak, with IA=1.
    
    Run 7045 - IA calibration scan.  Small screw up caused brief time
    with IA = 3, but scandata1=0... whoops.  Also, IA=1 setpoint was somehow not 
    recorded... low beam cut, maybe?
    
    Run 7046 - short test run, with IA=5.
    
    
    


    FIGURE 1