• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:02:03 on March 4, 2006

    Entry number 165101

    keyword=Beam Time Accounting
    Hall A

    03/04/06 0000-0800
    Experiment #: E02-013
    Shift Leader: Arrington
    Shift Workers: Urciuoli

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0.030.500.370.370.920.920.850.654.60
    Beam Available
    but Not in Use
    0.970.480.630.630.080.080.150.353.38
    Beam Not Available
    or Unacceptable
    0.000.020.000.000.000.000.000.000.02
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    0.030.501.001.001.001.001.001.006.53
    Planned Config-
    uration Change
    0.970.500.000.000.000.000.000.001.47
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: Start with access to put material in front of BB for rate check. At 1:45, remove shielding. 1:45-4:30 Rate scans. target dependence and raster-size dependence for 3He cell. 4:30-6:00 Beam position studies - trying to minimize drift chamber currents. High statistics runs, 3He with 3x3 and 1.5x1.5 raster. Start long H2 run. Get about 30 min and have problem with beam Target polarization measurement Emptry target test - DC current vs. large and small raster. (no run taken, just snapshots of current and trigger rates).

    Data Entry by: Arrington