Main INDEX
Monthly INDEX
PREV
NEXT
User name G.M. Urciuoli
Log entry time 00:09:21 on March 5,2006
Entry number 165222
keyword=Swing shift Report
16:00 shift starts
Shift crew:
G.M. Urciuoli (SL and TO)
F. Garibaldi (3rd)
H2 Target (135 PSIG)
Nominal Beam position:
BPMA: x = -1.26; y = -1.21
BPMB x = 1.22; y = -0.58
Run Nunmber Start Stop N. of Events
2643 15:54 16:16 1M
2644 16:21 16:46 1M
2645 16:48 ~17:05 317K
End of 2645 failed. We had to reboot Roc 24.
We continue with some Neutron detector study runs:
Neutron Detector threshold = -1000 mV
Runs 2646 and 2647 junk
Prescaler PS1 changed from 2000 to 200
Run 2648 Start at 17:25 Stop at 17:27
Neutron detector threshold set to -750 mV
Prescaler PS1 set from 200 to 1000
Run 2649 Start at 17:33 Stop at 17:48 Number of Events 586K
Neutron detector threshold set to -1000 mV
PS1 set from 1000 to 200
Run 2650 Start at 17:52 Stop at 18:01 Number of Events 460K
18:30 Helicity measurement stars, Target in optic foils position, beam 2 uA.
20:15 Helicity measurement stops. Moller measurement starts
22:50 Moller mesurement stops.
23:00 NMR measurement performed.
Target Polarized 3He
Beam Position:
BPMA: X = -0.6; Y = -1.5;
BPMB: X = =-0.6; Y = -1.0
Raster 3x3
Run 2654 Junk
Run 2655 start at 00:03