• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Albert

    Log entry time 13:36:01 on March 08, 2006

    Entry number 165788

    keyword=Shield

    On the front of 3-rd chamber was installed 1" acrylic shield. On the side of BB detector was installed 1" plastic 2'x8' 2 each and 1/4" aluminum 20"x8'.



    A copy of this log entry has been emailed to: bogdanw@jlab.org , feuerbac@jlab.org