• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Higinbotham

    Log entry time 14:39:40 on March 8,2006

    Entry number 165797

    keyword=Lumi Checked to Patch Panel

    Lumi Checked with a scope to patch panel in Hall. Use HV channel 3 to control signal #41 and use HV channel 6 to control #42.