• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 06:13:05 on March 9,2006

    Entry number 165896

    keyword=Summary of position scan for empty target


    Beam current = 1 µA.

    "Baseline"
    Ax = -0.6 Ay = -1.4
    Bx = -0.7 By = -1.0
    Channel Currents (µA)
    0= -8.3
    1= -1.7
    2= -25.4
    3= -2.5
    4= -23.8
    5= -23.8
    6= -9.4
    7= -4.2

    X scan.. (Ay=-1.6, By=-1.0)
    No appreciable change in currents all the way out to +4mm in A and B.
    BB HV trip (and EP chamber trip) at Ax=-1.5, Bx=-1.75

    Y scan (Ax=-0.6, Bx=-0.6)
    BB HV trip (and EP chamber trip) at Ay=-3.3, By=-3
    At Ay=3.0, By=3.44
    Chamber Currents:
    0= -13.0
    1= -2.7
    2= -35.9
    3= -3.7
    4= -32.8
    5= -23.0
    6= -14.6
    7= -5.9