    User name nerses

    Log entry time 21:03:23 on March 9,2006

    Entry number 166012

    This entry is a followup to: 166004

    keyword=DC leakage current for Carbon and He3 targets

    I have checked 2 runs with carbon target.

    Run DC1 DC2 DC3 Current Target
    2812-2813 4 4 4 5 He3
    2816-2817 9 7 4 2 Carbon Foils

    It seems that rates on 1st chamber increased from 4MHz (He-3 target) to 9MHz and for 2nd chamber from 4 to 7MHz. And because leakage current is bigger, effeciency is droped and amplifier module structures could be seen on the hitmap plots.
    Bogdan said that production will be done with 10 mkA, so we should
    prepare for operation at level of 8-9 MHz in every DC.
    There is need ASAP to have table of set voltage levels for HV source.