Main INDEX
Monthly INDEX
PREV
NEXT
User name johna
Log entry time 00:11:23 on March13,2006
Entry number 166438
keyword=Swing shift summary
Fairly smooth shift. Took a few 1-hour production runs, did some tests with the Ref(empty) and H2 targets [including one with bigbite at 300A]. One target polarization measurement (polarization has gone down ~2% since last measurement).
Lost 30 minutes because MCC software that locks the current had a problem and set our current to zero. MCC didn't notice, we didn't realize that MCC didn't know there was a problem.
Details below:
---- Production running ----
2905 Production, 3M events
---- Tests on Ref. cell (vaccuum) ----
2906 Ref(vaccuum), ~2x2mm raster (real), 1M events
2907 Ref(vaccuum), ~4x4mm raster (real), 1.2M events
---- Hydrogen data (tracking+shower calibration) ----
2908 Ref(H2)@131psig, 0.5M events (beam off for 30min in middle)
2909 Ref(H2)@131psig, 2.0M events
2910 Ref(H2)@131psig, 3M events, BIGBITE SET TO 300 Amps.
2911 Production, 3M events
NMR measurement at ~10:20pm gave 38.9%
2912 Production, 3M events
2913 Production, in progres...