• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J Wright

    Log entry time 02:18:47 on March15,2006

    Entry number 166718

    Followups:

    keyword=Target Polarization (NMR) and a warning

    We made an NMR measurement at 01:46 and it came back with no signal. I paged Ameya and he found that other vi's were running in the background. These interfered with the measurement. These were closed and another measurement was taken at 01:58. It came back normal.

    up: Peak amp. = 8.141E+1 Pol. = 37.268%
    down: Peak amp. = 8.047E+1 Pol. = 36.853%

    Target Operators: Make sure there are no vi's running in the background when you make an NMR measurement.