Main INDEX
Monthly INDEX
PREV
NEXT
User name J Wright
Log entry time 02:18:47 on March15,2006
Entry number 166718
Followups:
keyword=Target Polarization (NMR) and a warning
We made an NMR measurement at 01:46 and it came back with no signal. I paged Ameya and he found that other vi's were running in the background. These interfered with the measurement. These were closed and another measurement was taken at 01:58. It came back normal.
up: Peak amp. = 8.141E+1 Pol. = 37.268%
down: Peak amp. = 8.047E+1 Pol. = 36.853%
Target Operators: Make sure there are no vi's running in the background when you make an NMR measurement.