Analysis shift summary for Mar 18, 2300 to Mar 19, 0300 shift. Running production throughout the shift. Ran the shift_analysis.sh script in the bb_tracking/ directory for all the runs below.
3157: 2000 events. Rates here were compared with two earlier runs. (Related to Compton lock - see Nerses' entry # 167409).
Compton failed to restart. See entry 167432.
3158: 2000 events. Found a few bad wires in the drift chambers (167418) and a bad bar (left) on the BH (167419). This was observed in all the runs with the online analysis (onlineGUI). This is a known issue.
3159: 2000 events. DC efficiencies plot wouldn't print out for this run.
3160: 2000 events.
3161: 2000 events.
3162: 2000 events. Analyzer segfaulted twice; killed it and the rest of the script continued.
A few analyzer crashes, but otherwise a peaceful shift. Efficiencies for planes u3 and x3 are < 80%, the rest ≥ 80%.