• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Kolarkar

    Log entry time 03:45:05 on March 19, 2006

    Entry number 167431

    keyword=Analysis Shift Summary, Mar.18, 2300 to Mar.19, 0300

    Analysis Shift Summary 18 Mar 2006

    Analysis shift summary for Mar 18, 2300 to Mar 19, 0300 shift. Running production throughout the shift. Ran the shift_analysis.sh script in the bb_tracking/ directory for all the runs below.

    3157: 2000 events. Rates here were compared with two earlier runs. (Related to Compton lock - see Nerses' entry # 167409).

    Compton failed to restart. See entry 167432.

    3158: 2000 events. Found a few bad wires in the drift chambers (167418) and a bad bar (left) on the BH (167419). This was observed in all the runs with the online analysis (onlineGUI). This is a known issue.

    3159: 2000 events. DC efficiencies plot wouldn't print out for this run.

    3160: 2000 events.

    3161: 2000 events.

    3162: 2000 events. Analyzer segfaulted twice; killed it and the rest of the script continued.

    A few analyzer crashes, but otherwise a peaceful shift. Efficiencies for planes u3 and x3 are < 80%, the rest ≥ 80%.