The shift leader noted that the Raster looked dirty during 3187.
Replayed run 3173 (neutron) to create some new Veto time offsets. (60000)
Both Replays were done for 3189. Results are in the ELOG (replay). (2000)
Replayed run 3185 (neutron). (20000)
Looked at 3190 and 3188 with online GUI.
Troublesome wires: U1 123 X4 114&115 V4 180
N6 40 L still isn't working, and many of the Glascow detectors are hot.
3190 was saved in the PS directory.