Main INDEX
Monthly INDEX
PREV
NEXT
User name S.Abrahamyan
Log entry time 20:08:39 on March 20, 2006
Entry number 167630
keyword=Analysis shift summary
Beam tuning during runs 3205, 3206.
For run 3206 DC rates smaller than allways, because of current changes.
For all other runs DC rates looks normal.
Chamber efficiency and tracking efficiency information for
all runs during shift(3205,3206,3207,3208) looks reasonable.
Don't have TDC signal in N6 Left 41.
About 7.30 beam was down because of Accelator people need to do some work.