Main INDEX
Monthly INDEX
PREV
NEXT
User name S.Abrahamyan
Log entry time 22:55:37 on March 20, 2006
Entry number 167653
keyword=Analysis shift summary
runs collected during shift: 3205, 3206, 3207, 3208.
Done:
Online GUI info for all runs checked
Comment:
for run 3206 DC rates smaller than usual. This run was beam tuning run.
Problems:
N6 Left 41 TDC missing signal.
Done:
DC Efficiency and Tracking efficiency was checked for
all runs with small statistics(2000).
Comment:
Efficiency plots looks as usual (see attached figures).
Difficult to say something about X and Y position from tracking,
because of small statistics. Start to analyzer run 3208 with bigger
statistics(10000)
Done:
BCA checked for all runs.
Comment:
3205: BCA_u1 = 17 ppm, 3206: BCA_u1 = -31 ppm,
3207: BCA_u1 = -14 ppm, 3208: BCA_u1 = 35 ppm,
Done:
analyzed 10000 events of run 3208 with tracking.
Info:
X and Y distribution in shower reconstructed form tracking shown in
attached picture.
DC efficiency for run 3208
3208_eff.ps
tracking efficiency for run 3208
3208_trackefficiencies.ps
X and Y from tracking
3208_showerXY.ps