• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Nerses

    Log entry time 01:12:05 on March 25, 2006

    Entry number 168215

    keyword=Shift summary 5-12

    We had a beam starting run 3328.
    We run with ND prescaled starting 3329.
    It appeared that we had a for Beam Charge Assymmetry out of range measurements abs(a)>100ppm
    At the begining, the raster adjustment studies began with empty target.
    Then BB DC high Voltage tuning with He3 target.
    During run 3338 the DC Chamber 2 trip occured.