    User name S. Sirca

    Log entry time 17:22:37 on March 28, 2006

    Entry number 168718

    keyword=Day shift summary

    Apart from the few production runs at beginning of shift and two short non-standard raster-size runs (3460, 3461), spent most of the time pinning down the origin of the BB VDC high-voltage trips, in cooperation with the MCC.

    Although beam has been delivered for the most of the shift, NO run from 10am until 4pm should be considered as containing useful production data (most of that time all or some of the BB VDCs were off).

    From run 3464 on, IHWP is IN.