Main INDEX
Monthly INDEX
PREV
NEXT
User name Sulkosky
Log entry time 00:03:40 on March30,2006
Entry number 168833
keyword=Swing Shift Summary
Beginning of shift MCC is still investigating the beam spikes.
16:55 Bogdan called to turn DC HV on.
16:57 Channel L9.7 tripped off after only 12 seconds.
16:59 DC HV turned off.
18:10 MCC called to deliver 7 uA.
19:45 Move target to polarized 3He for MCC test plan.
19:54 NMR measurement: 55.2%
19:55 MCC begins test plan running on polarized 3He target at
2 uA, 5 uA, and 10 uA for 20 minutes each.
21:12 Move to Optics/12C target.
22:09 MCC called to ask about the drop in the T2 rate while at
10 uA on carbon. Aidan noticed that the BeO target has apparently
fallen over.
22:25 Move target to empty position (No target).
23:40 Begin test with raster off.
Run Summary
-----------
3485 Polarized 3He, at 2 uA, 5 uA and 10 uA, 1 Mevts
3486 Polarized 3He, at 10 uA, 699 kevts
3487 Carbon foils, at 2 uA and 5uA, 1 Mevts
3488 Carbon foils, at 5 uA, 1 Mevts
3489 Carbon foils, at 5 uA and 10 uA, 2 Mevts
3490 Empty target, at 2 uA, 5 uA and 10 uA, 963 kevts
3491 Empty target, at 0.5 uA, no raster