• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Sulkosky

    Log entry time 00:03:40 on March30,2006

    Entry number 168833

    keyword=Swing Shift Summary

    Beginning of shift MCC is still investigating the beam spikes.
    16:55 Bogdan called to turn DC HV on.
    16:57 Channel L9.7 tripped off after only 12 seconds.
    16:59 DC HV turned off.
    18:10 MCC called to deliver 7 uA.
    19:45 Move target to polarized 3He for MCC test plan.
    19:54 NMR measurement: 55.2%
    19:55 MCC begins test plan running on polarized 3He target at
    2 uA, 5 uA, and 10 uA for 20 minutes each.
    21:12 Move to Optics/12C target.
    22:09 MCC called to ask about the drop in the T2 rate while at
    10 uA on carbon. Aidan noticed that the BeO target has apparently
    fallen over.
    22:25 Move target to empty position (No target).
    23:40 Begin test with raster off.

    Run Summary
    -----------
    3485 Polarized 3He, at 2 uA, 5 uA and 10 uA, 1 Mevts
    3486 Polarized 3He, at 10 uA, 699 kevts
    3487 Carbon foils, at 2 uA and 5uA, 1 Mevts
    3488 Carbon foils, at 5 uA, 1 Mevts
    3489 Carbon foils, at 5 uA and 10 uA, 2 Mevts
    3490 Empty target, at 2 uA, 5 uA and 10 uA, 963 kevts
    3491 Empty target, at 0.5 uA, no raster