    Log entry time 12:00:23 on March 30, 2006

    Entry number 168905

    keyword=analysis shift summary 8-12

    Shift started with 3504. Online GUI looked ok but the HV tripped off to
    end the run.

    Wire & track eff results obtained for 3505

    [But Nilanga told us that the DC HVs are not exactly right. We changed
    them and started the run 3507]

    Wire & track eff results obtained for 3507
    We see the wire effs increased for most of the planes (by up to several
    %) compared to run 3505.

    [After 3507, Brandon fine tuned the HVs. started the run 3508]
    Wire & track eff results obtained for 3508. The wire effs are 72% or higher





    Figure 1