Main INDEX
Monthly INDEX
PREV
NEXT
User name tajima
Log entry time 12:00:23 on March 30, 2006
Entry number 168905
keyword=analysis shift summary 8-12
Shift started with 3504. Online GUI looked ok but the HV tripped off to
end the run.
Wire & track eff results obtained for 3505
[But Nilanga told us that the DC HVs are not exactly right. We changed
them and started the run 3507]
Wire & track eff results obtained for 3507
We see the wire effs increased for most of the planes (by up to several
%) compared to run 3505.
[After 3507, Brandon fine tuned the HVs. started the run 3508]
Wire & track eff results obtained for 3508. The wire effs are 72% or higher
Figure 1
