MCC has a problem with Hall C, and asked for beam shut down for 1.5 hour. During this period, NMR measurement was done: P=52.7%
After the beam came back, we are continuing to take production data.
Runs 3524,3525,3526 are fine.
During 3526 the beam was off as MCC reported due to problems with Hall-B
magnet.