    Log entry time 03:04:54 on March 31, 2006

    Entry number 168984

    keyword=Shift summary 20-03

    Run 3520,3521 production runs at 7 µA Run 3522,3523 production runs at 8 µA Details of change could be found here and in the references from there.

    MCC has a problem with Hall C, and asked for beam shut down for 1.5 hour. During this period, NMR measurement was done: P=52.7%

    After the beam came back, we are continuing to take production data. Runs 3524,3525,3526 are fine. During 3526 the beam was off as MCC reported due to problems with Hall-B magnet.