• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J Miller

    Log entry time 05:49:03 on April 3,2006

    Entry number 169372

    keyword=Analysis Shift Summary 2 am - 6 am

    Turned back on N5-40L, this was turned on for the trigger.

    Analyzed run 3615.

    Analyzed run 3616.

    At 5 am ROC 4 crashed. Alexandre could not reboot it, so we went down into the hall and manually reset it. We also tightened the connection to N4-6R HV, which appeared to fix that problem.


    FIGURE 1

    FIGURE 2