• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Puckett

    Log entry time 23:51:27 on April 3,2006

    Entry number 169451

    Followups:

    keyword=swing shift summary

    Swing Shift Summary, 04/03/06

    Shift Leader: Andrew Puckett
    Target Operator: Kalyan Allada

    Took over from day shift at 16:00 in the middle of production run 3626. Target position is Pol. 3He. Beam current is 8 muA.

    Beam is pretty bad for most of the shift, there are 2 good production runs near the beginning of the shift and from about 21:30 to 22:30 (9:30-10:30 pm), but other than that, there is not much here. Almost immediately after the end of the second good run (22:30) the beam shuts off and doesn't come back on. After a few minutes, MCC calls to inform that there is a problem with the Hall A laser at the polarized source, the phase lock is broken/turned off. Injector expert is here, made an access and is working on the problem as I get ready to pass off to owl shift.


    GEN DAQ RUNS:
    Run # Start Stop Nevents Replay? Comments
    3626 15:43 16:42 2M Y
    3627 16:42 17:02 625K Y Ended early for MCC to fix RF problem
    3628 17:44 17:46 no beam, take cosmic data, adjust prescalers
    3629 17:47 19:06 cosmic run, changed thresholds and prescalers
    3630 19:18 19:20 N beam back at 1 muA, spot check and readjust thresholds and prescalers...
    3631 19:23 19:44 284K Y beam at 8 muA, production
    3632 19:45 20:45 Y bad beam on and off availability
    3633 20:59 21:23 Y bad sporadic beam
    3634 21:23 22:30 2M Y good beam but many trips
    3635 22:32 22:54 junk, almost no beam this run
    3636 23:02 cosmic run, beam off Hall A laser at the source problem



    COMPTON RUNS:
    Run # Start Stop Pe*Pg S/N Comment
    13261 19:29 21:36 92.9 3.8 beam pretty bad during this run
    13262 21:38 22:57 89.4 5.2 also during this run
    PARITY RUNS:
    Run # Start Stop N Aq Comment
    7214 20:32 bad beam most of run
    7215 21:27 23:42 240K 144 better beam, kept running for a while with no beam forgot to end run