• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Miller

    Log entry time 06:02:07 on April 4,2006

    Entry number 169478

    keyword=Analysis Shift Summary 2 am - 6 am

    Initially we had no beam. When we got beam the DC HV tripped and took a while to reset, also the ROCs needed reseting.

    Analyzed run 3639.

    Runs 3639-3640 are Production Runs.

    Analyzed run 3640.

    DC HV kept tripping throughout the night.

    Analyzed run 3642.

    Probably has been over 10 DC trips this shift, all channels trip when one occurs.


    FIGURE 1

    FIGURE 2