    Swing shift 1600-2400
    SL J. LeRose
    TO T. Ngo

    Program is production running:
    at shift start run 3792 in progress and target is having a temperature stability problem. Target experts are working on it. See halog 170124
    18:45 Noticed trace showing T2 got quiet (same rate but less noise). Cause was ROC3 not reporting in CODA. Rebooted ROC3 and restarted CODA. See Halog 170126. Made a target polarization measurement while rebooting ROC3 and restarting coda (51% see halog 170127)
    ~19:10 Hall C (Serge Kox) announces desire to take away our energy locks between 20:00 and 20:30. We (RC and I) agree. During the time the locks are off we plan to run at 5 micro-amps instead of 8.
    20:05 Energy locks off stopped all running DAQ and restarted at 5 micro amps
    20:37 Energy locks are back on continuing started runs.

    production runs:
    run start/stop
    3792 15:41/16:47 2M Production data
    3793 16:47/17:49 2M Production data
    3794 17:49/18:45 1.5 M ROC 3 failed
    3795 18:50/19:50 2M Production data
    3796 19:50/20:05 0.5M Production data
    3797 20:12/21:28 2M Energy locks off 5 micro-amps
    3798 21:29/22:28 2M Production data
    3799 22:28/23:29 2M Production data
    3800 23:29/....

    Compton runs (the word is automatic run ends are not working, but manual end works fine)
    13334 16:04/17:25
    13335 17:27/18:59
    13336 19:00/20:05 run end failed, rebooted
    13337 20:12/21:40 energy locks off for 1st ~20min
    13338 21:40/23:04
    13339 23:05/....

    Happex
    7302 15:42/20:05
    7303 20:12/.... energy locks off for 1st ~20min