Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 00:02:18 on April10,2006
Entry number 170150
keyword=Shift Summary
Swing shift 1600-2400
SL J. LeRose
TO T. Ngo
Program is production running:
at shift start run 3792 in progress and target is having a temperature stability problem. Target experts are working on it. See halog 170124
18:45 Noticed trace showing T2 got quiet (same rate but less noise). Cause was ROC3 not reporting in CODA. Rebooted ROC3 and restarted CODA. See Halog 170126. Made a target polarization measurement while rebooting ROC3 and restarting coda (51% see halog 170127)
~19:10 Hall C (Serge Kox) announces desire to take away our energy locks between 20:00 and 20:30. We (RC and I) agree. During the time the locks are off we plan to run at 5 micro-amps instead of 8.
20:05 Energy locks off stopped all running DAQ and restarted at 5 micro amps
20:37 Energy locks are back on continuing started runs.
production runs:
run start/stop
3792 15:41/16:47 2M Production data
3793 16:47/17:49 2M Production data
3794 17:49/18:45 1.5 M ROC 3 failed
3795 18:50/19:50 2M Production data
3796 19:50/20:05 0.5M Production data
3797 20:12/21:28 2M Energy locks off 5 micro-amps
3798 21:29/22:28 2M Production data
3799 22:28/23:29 2M Production data
3800 23:29/....
Compton runs (the word is automatic run ends are not working, but manual end works fine)
13334 16:04/17:25
13335 17:27/18:59
13336 19:00/20:05 run end failed, rebooted
13337 20:12/21:40 energy locks off for 1st ~20min
13338 21:40/23:04
13339 23:05/....
Happex
7302 15:42/20:05
7303 20:12/.... energy locks off for 1st ~20min