• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name X. Zhu

    Log entry time 08:07:44 on April20,2006

    Entry number 171356

    keyword=Shift summary

    shift start without beam
    4:30 NMR measurement: polarization is 51.9%
    4:45 beam back to hall
    6:25 after beam tuning, compton tuning and raster study,start data taking with polarized he-3 target



    run 4080 0.05M, raster study:2x2mm,FSD is under tuning, empty target
    run 4081 0.1M, empty target
    run 4082 0.7M, production on he3 target
    run 4083 0.7M raster 2.5x2.5mm
    run 4084 0.9M raster 3x3mm
    run 4085 continue data production raster:2x2