• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Camsonne

    Log entry time 15:37:30 on April20,2006

    Entry number 171379

    keyword=Compton vertical scan

    The beam seemed to have move since it was resumed.
    I made a vertical scan of the chicane to optimize the interaction point with the lazer. Now we should have a background ove noise ratio around 2 compared to 0.6 before. Position on target did not change.
    Run 13469 is taken with the new settings.


    FIGURE 1

    FIGURE 2