    Started the shift with the reference cell in.

    8:00 Run 4175. Reference cell, normal raster size.
    8:30 Run 4176. Reference cell, 1.5x1.5 raster (4.5x3.15 in controls)
    9:00 Beam off for pass change.
    Requested controlled access.
    10:00 NMR and EPR measurements were done.
    12:00 Everyone out of hall
    13:53 Beam back. Adjusted raster size. Asked MCC to work on Compton rates. Probably still needs a little tuning
    14:21 Asked for beam off to put the target in and do an NMR.
    14:30 Asked MCC to reinitialize Fast raster for the new energy. (3.290)
    14:33 NMR done asked for 8uA.
    15:05 Compton optimization is finished, asked MCC for proper beam position
    15:13 start run 4189 , still optimizing, beam pos and raster
    copntinue optimize raster size and scan beam position