    User name Boeglin

    Log entry time 16:06:31 on April25,2006

    Entry number 171910

    keyword=Shift Summary

    8:00 Beam off for beam studies. Run 4211 ended.
    8:15 Ameya did an EPR measurement
    9:05 called MCC asked for controlled access
    9:55 Hall at restriced access for tour
    11:30 call MCC ask for a sweep to cose the hall
    12:45 completed sweep
    13:07 start run 4220 with 31 MHz CW mode pulsed beam (according to MCC)
    13:50 stop run for a controlled access to the Hall to adjust a discriminator setting. MCC would also use the access to check the Moeller.
    15:10 call MCC and ask for beam
    15:23 start run start 4222
    15:38 end run 4222, change prescale values, start 4223