User name Lindgren
Log entry time 23:56:14 on April29,2006
Entry number 172446
keyword=Swing Shift Summary
Swing Shift Summary
SL R. Lindgren
TO M. Shebastri
Start Run 4332 End Run 4332 0124M Events
Change beam position to:
BPMA -1.337 -1.504
BPMB -1.286 -0.999
Move target position to empty air position
Raster 2 x 2 mm^2
Take 10 minute runs and measure leakage current as a function of raster size
Run Raster Leakage current
4333 2 x 2 -73.47,-14.90,-104.4
4334 3 x 3 -73.50,-15.00,-104.5
4335 4 x 4 -74.14,-15,12,-104.8
4336 5 x 5 -74,12,-15.14,-105.1
Now move target to vacuum referenced cell position
Take 20 minute runs with about 7.7 ua
Run Raster Leakage Current
4337 2 x 2 -51.7,-9.54,-97.0
4338 3 x 3 -53.8,-9.9,-99.5
4339 4 x 4 -64.7,-12.7,-112.8
Put in 137 PSI H2 2 x 2 raster Take data
20:35 Run 4340 ended. Took 2M events on hydrogen.
Start Run 4341 on Hydrogen
20:45 Coda Crashed. Rebooted DAQ.
20:48 Start Run 4342
21:55 Hall C request MCC to put HWP IN.
End Run 4342 1.87 M Events
Purged H2 from cell.
Put 50 psi of N2 in cell.
Run 4314 started 22:01
22:20 Lowered beam current to 5.3 ua to reduce
leakage current from 98 to 76 in DC (Channel 9.0)
22:38 Ended N2 Run 2.0M Events
Vent and evacuate reference cell
Move to empty target position
Call MCC. Steer beam back to original position
Move to polarized target. Do NMR get 57.4%
Start Run 4344 Production on polarized He3 target
DC HV just crashed Reset it.
Neutron HV GENps1:2004 crashed Reset crate and turn HV ON and OFF
Noticed that there was a large spike in the beam energy just before crash.
See Halog entry graph.
Start Run 4345 23:24 Production Run
SWing Shift Ends