User name R. Feuerbach
Log entry time 14:17:41 on May 01, 2006
Entry number 172641
This entry is a followup to: 171935
keyword=correction: det1 was connected (for pulsed beam studies)
Looked at the cabling of the additional detectors added in for the pulsed
beam operation, and found that the signal from det1 was plugged into the
F1-TDC. Detectors det1, det2, and liq.scin are and were plugged into
roc/slot/channel = 4/25/48-50, respectively.
Before the recabling to produce a smaller time-walk sensitive signal for
det1, det1 went into channel 50 and the liq.scin. detector went into
channel 48. This change is what caused the confusion.
So det1 and det2 were readout with the F1TDC's, however the signal from
the liq.scin. was missing, at least for run 4222, though the cables were
connected (HV turned down?).
A copy of this log entry has been emailed to: brads, bogdanw