User name kalyan
Log entry time 00:09:44 on August 7,2006
Entry number 177810
keyword=swing shift/run summary
Shift Summary
--------------
16:15 shift started with beam permit
16:30 took the beam with empty target for checking raster size
16:59 production started with LD2
18.00 changed to LH2 target->production
19:55 MCC called and took away the beam for PZT test
20:08 beam restored to 20muA
20:11 production started with LH2 again
22:05 5% radiator is in and running with LH2
22:31 Right arm run started
23:40 4% radiator in. current changed to 12muA
Run Summary
------------
2220 empty target run for raster size check
2221 LD2 1.95M
2222 LD2 1.9M
2223 LH2 junk--> NMR dipole field drift
2224 LH2 0.58M
2225 LH2 0.25M
2226 LH2 0.69M
2227 LH2 15K
2228 LH2 50k
2229 LH2 127K
2230 LH2 1.3M
2231 junk
2232 LH2 (5% rad in) 1.1M
2233 LH2 (5% rad in) 1.5M
2234 LH2 (4% rad in) still running