    User name Kalyan Allada

    Log entry time 16:02:38 on September30,2006

    Entry number 185979

    keyword=Shift/Run Summary

    Shift Summary
    ------------------------------------

    8:19 MCC called and want to fix the beam trips. It might take 30mins
    8:53 beam is back
    10:10 Q1 on both left and right arm tripped and also dipole on left arm tripped due to the low He flow. Went to controlled access and reset the quads.

    11:10 Quads reset locally and D1 on left arm was also reset. ready to take the beam

    12:41 Q1s tripped again. had to go to controlled access to fix them.

    13:27 beam is back and resumed e-p calibration runs





    Run Summary(e-p elastic)
    -------------------------------------
    Run Events
    5377 3.9M
    5378 5.0M
    5379 2.4M
    5380 2.9M
    5381 5.0M
    5382 5.0M
    5383 1.3M