Main INDEX
Monthly INDEX
PREV
NEXT
User name johna
Log entry time 00:03:04 on October 4,2006
Entry number 186248
keyword=shift summary - swing shift
MCC started restoring beam around 7:00.
Sirish checked the compton background rates around 10:00, and it looked OK.
MCC took beam to start delivery to Hall B - restored beam to Hall A at about 10:30. We did a raster size scan and determined that requesting a 12mm x 12mm raster gave us a 1.5mm x 2mm raster.
23:30 - Started pointing runs.
1034 - pointing run with no sieve slits (carbon target)
1035 - run with sieve slit in left arm (carbon target)
Shift ends during sieve slit run.