8:30 beam taken away to switch back to longitudinal
9:11 Beam back in the Hall check of spot
Run 1182 Run 1183 Run 1184
9:22 requested spot size 4x3 mm gives 2x2mm on target
9:26 moved to He4 target
9:35 Production run 1185 ps3 a bit too low but since only a few hundreds hertz this will change only a bit the dead-time, though coincidence trigger have to be chosen 9:48 Junk run beam was taken away short run 1186
10:01 Production run 1187
10:49 Beam taken away by MCC for tune Beam profile was not very good
10:52 beam back but not good beam for data taking MCC still working on it
13:35 MCC ready to restore beam
13:51 HARP scan : beam looks good, raster too
13:59 Production run 1191 at 80 uA
15:30 found out NMR was stuck and current had drifted a lot Power cycled NMR
1556 Dipole settled start production run 1192
Run 1185 1.4 M ps3 a bit low
Run 1186 Junk short run
Run 1187 He 4 prod 2.13 M but need to be check beam profile was not good
Run 1188 Harp Scan
Run 1189 Raster chevk
Run 1190 Production low cuurent at beginning 37 K event
Run 1191 3M events has to be checked Right NMR got stuck
Run 1192 running but should be ok ....