• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Camsonne

    Log entry time 16:33:52 on October 10, 2006

    Entry number 186746

    keyword=Day shift summary

    8:00 Run 1181 running C no collimators

    8:30 beam taken away to switch back to longitudinal

    9:11 Beam back in the Hall check of spot

    Run 1182 Run 1183 Run 1184

    9:22 requested spot size 4x3 mm gives 2x2mm on target

    9:26 moved to He4 target

    9:35 Production run 1185 ps3 a bit too low but since only a few hundreds hertz this will change only a bit the dead-time, though coincidence trigger have to be chosen 9:48 Junk run beam was taken away short run 1186

    10:01 Production run 1187

    10:49 Beam taken away by MCC for tune Beam profile was not very good

    10:52 beam back but not good beam for data taking MCC still working on it

    13:35 MCC ready to restore beam

    13:51 HARP scan : beam looks good, raster too

    13:59 Production run 1191 at 80 uA

    15:30 found out NMR was stuck and current had drifted a lot Power cycled NMR

    1556 Dipole settled start production run 1192

    Run 1185 1.4 M ps3 a bit low Run 1186 Junk short run Run 1187 He 4 prod 2.13 M but need to be check beam profile was not good Run 1188 Harp Scan Run 1189 Raster chevk Run 1190 Production low cuurent at beginning 37 K event Run 1191 3M events has to be checked Right NMR got stuck Run 1192 running but should be ok ....