Main INDEX
Monthly INDEX
PREV
NEXT
User name A. Camsonne
Log entry time 04:29:41 on October19,2006
Entry number 187626
keyword=Compton scan with photon detector
Sirish restored the gain the were previously used at a previous running at 2.6 GeV on the photon detector. Might have seen the interaction point between -0.1 and 0.0 but did not see a big change in rate when going back with a smaller step size. Leaving the position at -0.23 with a Bdl of 407340 G.cm to check if there is a change in electron detector spectrum.
FIGURE 1