    Log entry time 23:54:55 on October 24, 2006

    Entry number 188232

    keyword=Swing Shift Summary

    16:00 Shift stars with 48uA, LH2 target in, B10 kinematics pointing
    measurements HRS-L sieve in. Compton group is working with their
    detector, making the HV beep!

    16:05 Compton group requests opportunity to put an electron detector
    "in", we said OK.

    17:35 Begin change to new collimator settings, HRS-L open, HRS-R sieve
    17:48 Change complete to HRS-L open, HRS-R sieve, restarted taking data
    with run #1737
    18:03 Requested current increase to 80uA

    18:38 Sanity check on HRS-L collimator, which should be open but the
    HRS-R sieve appeared in the HRS-L spectra...10 Minutes. Noticed that
    HRS-L collimator still sticks, at about the same place, when trying to
    move from "open" to "sieve".

    20:44 MCC called to let us know that they have their PZT test planned for
    21:00.

    21:00 Beam taken for PZT.

    21:14 MCC called back to let us know they are done. We requested 80uA
    and restarted running with LH2 HRS-R sieve.

    22:05 Move to 12C single foil

    22:10 12C single foil target in, requested 80uA raster off.
    23:54 Running 12C foil at a snail's pace, with 80uA. HRS-R sieve in.
    It's going to be a while...