    16:00 Shift starts with the HRS-L dipole unwilling to reset itself. John
    LaRose is working on it.

    16:12 Start taking beam on 10 cm He target starting with 30uA and
    ratcheting up to 80uA

    16:24 Ramped beam up to about 60uA with a little less than 10 W headroom
    aon the HPH. Will leave it at 60uA for now. Raster is on. Coolant is
    limited from CHL at 15 g/s.

    17:05 HRS-L dipole finally reset. Restart collecting data with Run #1750.

    17:25 Reset trigger & carbon doors and started taking helium production data.

    19:30 Requested beam position be re-centered. Noticed that the BPM's had
    frozen up.

    20:44 MCC called to let us know they have their PZT scheduled for 21:15
    tonight.

    21:00 HRS-L Q3 drifted, but reset itself. We stopped run 1754 to let it
    settle down.

    21:18 Start evening's PZT. Stopped run 1755.
    21:34 HRS-L Q3 drift, resolved itself.
    21:35 Beam back at 60uA from PZT. Resumed data taking with run 1756.

    22:19 Mike P. requests an analysis of the FPP to see if the apparent hot
    wires are real. Nothing particularly outstanding was noticed on the
    results of the FPP analyzer, but it should be looked at by an expert.

    22:40 Online analysis of new run 1757 did not show chamber 4 spikes.

    23:20 HRS-L Q3 drifted to 1.354 from set point value 1.3526. "Toggled"
    momentum set point and the magnet reset to the appropriate value.

    23:27 HRS-L Q3 drifted low, reset by "toggling". Let 1758 continue running.

    23:57 Finished shift during run # 1758, 60uA Helium 10 cm target.