    User name eschulte

    Log entry time 00:11:20 on October 27, 2006

    Entry number 188357

    keyword=Swing Shift Log

    16:00 Shift starts taking production data on 4He 10 cm target, 55uA, run#
    1766.

    19:01 MCC takes beam to reconfigure Hall B.
    19:00 to 21:00 Hall B setup no beam.

    20:48 MCC called to let us know they are ready to send beam back.
    Requested 55uA. Begin data taking with run #1768

    21:08 HRS-L Q3 drift

    23:49 Possible HRS-L NMR lock lost and then regained. The NMR seems to
    be OK, but the signal abruptly changed value (on a highly blown up
    scale). Effected run 1769. See Entry: 188354

    23:55 Reboot both HRS-L & HRS-R IOC's and HRS-R NMR. The readings
    appeared frozen, although the NMR for both looked OK. After reboot, the
    HRS-L didn't seem to come back quite right so the Owl shift rebooted the
    left again.