    Shift workers: J. P. Chen (SL), B. Norum (TO).

    8:00-8:30 production, 85 uA on He4.
    8:30 beam off for beam study. Hall A to restricted access
    for spectrometer survey, which is expected to take 5-6 hours.
    At the meantime, Hall A techs working on the spectrometer
    controls; Bob and Alexandre working on Compton stuff.

    2:30 pm Around 2 pm Survey was completed. MCC is going to be ready by 2:30-3:00. Hall A techs will need more time to wrap up things,
    by maybe 5 pm.

    3:30 pm Hall A techs finished their work. Ed Folts requested MCC
    to send ARMS to do sweep. We are setting magnets back to the proper values.
    4:00 pm All quads are set. Only Right dipole is still going up and left dipole is settling down.




    run 1866 7:29-8:15, 85 uA on He4, 1M.