• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen/Dimitri

    Log entry time 17:41:06 on November 6,2006

    Entry number 189010

    keyword=cryotarget (He4) cooldown completed

    CHL finally stabalized at around 3:30 pm. Cool-down He4 target started
    after that. We had to go down to the hall to switch to a new cylinder of He4 gas in the middle of cool-down.
    Fan speed is at 36 Hz. Temperature at 6.6K, Pressure at 187 psi.
    With CHL flow of ~19 g/s, HP heater power is 330 W.