Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen/Dimitri
Log entry time 17:41:06 on November 6,2006
Entry number 189010
keyword=cryotarget (He4) cooldown completed
CHL finally stabalized at around 3:30 pm. Cool-down He4 target started
after that. We had to go down to the hall to switch to a new cylinder of He4 gas in the middle of cool-down.
Fan speed is at 36 Hz. Temperature at 6.6K, Pressure at 187 psi.
With CHL flow of ~19 g/s, HP heater power is 330 W.