Main INDEX
Monthly INDEX
PREV
NEXT
User name Ramesh
Log entry time 23:52:23 on November 8,2006
Entry number 189106
keyword=Shift Summary
Shifts starts with the start of run 2030.
Target: Carbon
Current: 85uA (unless otherwise stated)
Runs 2030, 2031: production runs.
19:35 MCC took away beam for PZT test for 15 minutes.
20:36 MCC still has problem to send the beam back.
Run 2032 junk (due to no beam).
20:53 Beam back.
Run 2033 production
Run 2034 running parallel with Compton/Charge Assymetry study (Hall C) @55uA
23:02 Hall C assymetry test finished, run 2034 ended.
Run 2035 Runs with parallel to Compton/Charge Assymety study @55uA.