• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Adaq

    Log entry time 07:48:32 on November29,2006

    Entry number 189461

    keyword=Target Warm Up


    At 6:40 am the CHL 4K coolant flow dropped from 8 g/s to 3 g/s.
    The target warmed up very quickly. Paged JP Chen.
    The H2 Fill Solenoid was opened. The Fan speed was set to 28Hz


    FIGURE 1

    FIGURE 2