Main INDEX
Monthly INDEX
PREV
NEXT
User name Adaq
Log entry time 07:48:32 on November29,2006
Entry number 189461
keyword=Target Warm Up
At 6:40 am the CHL 4K coolant flow dropped from 8 g/s to 3 g/s.
The target warmed up very quickly. Paged JP Chen.
The H2 Fill Solenoid was opened. The Fan speed was set to 28Hz
FIGURE 1
FIGURE 2