Main INDEX
Monthly INDEX
PREV
NEXT
User name suleiman
Log entry time 08:02:33 on December 1,2006
Entry number 189650
keyword=Owl Shift Summary
- 00:00 Asked MCC for beam
- 00:50 20 uA in Hall A, start run 1168 - ep elastic.
- 01:10 Run 1169 - ep elastic.
- 02:00 Moved to 20 cm Dummy, Run 1170 at 10 uA.
- 02:20 Moved to Empty, Run 1171, 1172 20 uA.
(end of run 1172 has optics target data in it - did not
end run before moving target).
- 03:10 Moved to Optics, Run 1173.
- 03:35 Moved to H2, Run 1174 ep elastic.
- 04:10 Changed Left by +3% to 2.188 GeV, run 1175.
- 04:35 Changed Left by -3% to 2.060 GeV, run 1176.
- 05:05 Changed Left back to 0% (2.124) - cycled Q2/3
Run 1177.
- 05:40 Changed Right by +3% to 1.951 GeV, run 1178.
Dipole kept drifting higher. We will not move the elastic
peak in the Right Arm.
- 06:20 Turn Right Dipole NMR Regulator OFF and set Dipole
curent to 656.9 A, run 1179.
- 07:00 Cycled Right Q2/3
- 07:10 Run 1180 to test EPICS variables
- 07:15 Run 1181 while Right Dipole is coming back to 1.894 GeV
- 07:35 Right Arm back to 1.894 Run 1182 ep-elastic.