16:00 Recovery in progress from ESR crash
16:30 Called for controlled access to reset magnet power supplies that are
gone during ESR crash
17:10 Magnets are back. Ready for the experiment.
17:20 Target moved to He3 position. Asked 30uA
17:40 MCC called. They have some problems with BLM and working on it.
17:45 Beam back. Start to take data
Run 1311
Run 1312 DT is about 20%
Run 1313
20:06 MCC called. They want to do PZT scan. Stopped run 1313
While waiting for MCC, we changed kinematics
L: 3.051 GeV, 19.399 deg
R: 0.5193 GeV, 69.590 deg
20:32 MCC finished PZT scan. Restoring 30uA beam to the hall.
20:32 Adjusting Cerenkov HV
Run 1314 junk
Run 1315 Good run.
21:10 MCC called. The beam will be stopped until 21:30. They have to
replace crate power supply, etc.
21:30 Beam restored to 30uA
Run 1316 Another good run
Run 1317 Still more good runs