Main INDEX
Monthly INDEX
PREV
NEXT
User name suleiman
Log entry time 07:58:33 on December 8,2006
Entry number 190316
keyword=Owl Shift Summary
00:00 MCC is trying to deliver high beam current.
Run 1391 was with unstable beam.
00:45 Stable beam at 60 uA.
Start run 1392, Kin #6 on He3.
01:15 Beam current is now 70 uA.
02:25 Note that S1 L-PMT 5 has no ADC spectrum.
02:45 MCC wants to change Energy Lock to Hall C line.
02:46 Run 1393 70 uA He3.
03:45 Beam OFF because of too many trips in the extraction region.
Runs 1394 & 1396 with little beam.
Run 1395 cosmic.
06:15 Beam back at 40 uA.
06:20 Start run 1397 at 40 uA. Continue into the day shift.