Main INDEX
Monthly INDEX
PREV
NEXT
User name E.Chudakov
Log entry time 20:17:23 on December 8,2006
Entry number 190338
keyword=Beam current calibration
CODA run 1400
BCM file 107
The currents: 60, 40, 20, 10
at 5 it got stuck in the injector.
Faraday cup may be missing for the 60uA point.
CODA run 1401
BCM file 108
Currents: 5, 2, 1, 0.5, 0.2, 60
At 60 in the hall there were several trips an then it became
more stable. After that we made another Faraday cup run.
FIGURE 1
FIGURE 2