Main INDEX
Monthly INDEX
PREV
NEXT
User name M.Olson
Log entry time 08:01:20 on December14,2006
Entry number 190713
keyword=Owl Shift Summary
OWL SHIFT SUMMARY
0000: Run 1485 in progress (production-style running on dummy target)
0109: End run 1485 (0.376 C) (beam down for QE measurement)
0114: Start run 1486
0253: Lost vertical fast raster magnet. End run 1486 (0.395 C)
0255: Paged on-duty technician
0310: Paged on-duty technician
0320: Called on-duty technician at home
0325: On duty technician called back, indicated raster magnet is outside his area. I paged Bob Micheals, who participated in last fix of this problem (05NOV06).
0335: Left voicemail on cell phone of run coordinator, informing him of the loss of the vertical raster.
0355: Spoke with run coordinator, suggested I page Jack Segal, who participated in the last fix of this problem.
0420: Run coordinator calling Bob Michaels at home.
0445: Bob Micheals contacted at 0430. He is coming in to look for spare unit. He suggested I try paging William Gunning, but his pager number appears to be out of service.
0454: Started run 1487 (cosmics) at Elena's request.
0500-0545 Bob and I located and installed spare raster driver.
See Bob's halog entry for details
0600: End run 1487 (cosmics), asking for beam.
0607: Beam coming back up
0611: Beam-spot test, run 1488 (target out)
prescale ps8 to "4", short run to observe beam spot using spot++
0619: spot++ for test run appears same as 1485 (before problem).
Beam positions look good on Hall A tools as well.
0620: Putting He3 target back in and returning to production running.
0630: He3 target in, beam coming back up
0632: Start run 1489, He3 production
0700: End run 1489
(! PRESCALES STILL SET TO DUMMY TARGET VALUES) Resetting prescales for He3 running
0705: Start run 1490 (prescalers reset to He3 values)
0800: Run 1490 in progress, good stable beam upon resumption of He3 production running.