    Swing Shift Summary
    (Friday, 15th Dec, 06)






    Shift Crew:  Salvatore Frullani and Ramesh Subedi



    Kinematics: 8

    Left HRS (electron) p0 = 2.803 GeV/c    Angle = 30.648°

    Right HRS (proton) p0  = 0.832 GeV/c    Angle = 59.181°

    Beam into the hall 84uA (MCC BCM), hall A BCM shows 90uA.



    Shift Summary






    • 16:00             Shift started with the run no 1511 passed on from the day shift



    • 19:00             Asked MCC for 1 more mA seeng at the heat load on the target and thinking (Makis's suggestion) that we could take 85uA.



    • 20:12   Jack Segal found right hrs magnets' readback was dead, rebooted IOC16 through the web and brought it back. Thanks Jack. I went to the halog "start of run" entries and saw that this readback was frozen since (and may be during the run 1508) the run 1509 at 11:13 this morning. Fortunately data are there.



    • 20:46   MCC is performing to do a PZT test. No beam for about 10 minutes, run 1513 ends.



    • 21:01   PZT test done. Beam back.



    • 21:01   Started the run 1541.






    Run Summary




    All runs are kinematics 8 production runs on 3He at 84µA with the rastered beam.


  • From the last shift Run 1511 (3.29 M)


  • 17:01 - 19:06        Run 1512 (3.20 M)


  • 19:06 - 20:47        Run 1513 (2.54 M)


  • 21:01 - 23:07        Run 1514 (3.32 M)



  • 23:08                     Run 1515 - Passed on to the owl shift