Shift Crew: Salvatore Frullani and Ramesh Subedi
Kinematics: 8
Left HRS (electron) p0 = 2.803 GeV/c Angle = 30.648°
Right HRS (proton) p0 = 0.832 GeV/c Angle = 59.181°
Beam into the hall 84uA (MCC BCM), hall A BCM shows 90uA.
Shift Summary
- 16:00 Shift started with the run no 1511 passed on from the day shift
- 19:00 Asked MCC for 1 more mA seeng at the heat load on the target and thinking (Makis's suggestion) that we could take 85uA.
- 20:12 Jack Segal found right hrs magnets' readback was dead, rebooted IOC16 through the web and brought it back. Thanks Jack. I went to the halog "start of run" entries and saw that this readback was frozen since (and may be during the run 1508) the run 1509 at 11:13 this morning. Fortunately data are there.
- 20:46 MCC is performing to do a PZT test. No beam for about 10 minutes, run 1513 ends.
- 21:01 PZT test done. Beam back.
- 21:01 Started the run 1541.
Run Summary
All runs are kinematics 8 production runs on 3He at 84µA with the rastered beam.
From the last shift Run 1511 (3.29 M)
17:01 - 19:06 Run 1512 (3.20 M)
19:06 - 20:47 Run 1513 (2.54 M)
21:01 - 23:07 Run 1514 (3.32 M)
23:08 Run 1515 - Passed on to the owl shift
|