Shift Crew: Ramesh Subedi and Evaristo Cisbani
Kinematics: 8
Left HRS (electron) p0 = 2.803 GeV/c Angle = 30.648° (main scale=31,Vernier=-30)
Right HRS (proton) p0 = 0.832 GeV/c Angle = 59.181° (main scale=59,Vernier=-2.8)
Beam into the hall 83uA (MCC BCM), hall A BCM shows 89uA.
Shift Summary
- 16:00 Shift started with the run no 1523 passed on from the day shift
- 16:36 Saw left hrs magnet readback frozen. Rebooted iocha14 through the web, came back to normal. This readback had been freezing somewhere between the runs 1522 and 1523 (figured out after looking at the "start of run" halog entries).
- 19:19 Saw left hrs magnet readback frozen again. Rebooted iocha14 through the web, came back to normal.
- 20:51 MCC took away beam for PZT test. Stopped the run 1525.
- 21:05 PZT test finished. Beam back.
Run Summary
All runs are kinematics 8 production runs on 3He at 83µA with the rastered beam.
From the last shift Run 1523 (3.10 M)
17:09 - 19:09 Run 1524 (3.08M)
19:10 - 20:51 Run 1525 (2.59M)
21:06 - 23:11 Run 1526 (3.00M)
24:00 Run 1527 - Passed on to the owl shift
|