• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 14:57:03 on February 2,2007

    Entry number 191395

    keyword=2-daq setup notes

    Per request of the Li/B experimenters, the 2-daq setup was
    restored. The Left HRS DAQ runs on a-onl/adaql2 and the
    Right HRS runs on adev/adaql1. This is how it was in summer 2006.

    Instructions for DAQ :
    hallaweb.jlab.org/equipment/daq/guide2.html
    and more general info:
    hallaweb.jlab.org/equipment/daq/guide.html

    Notes:
    1. I had to add 50 nsec to the gate time on L-arm to make the
    ADC gate look good. Need to check if TDCs still in range.
    2. Still to do: Re-establish the synch signal (if still desired)
    and update the EPICS scripts.
    3. Run numbers reset to avoid interference in MSS.