User name R. Michaels
Log entry time 14:57:03 on February 2,2007
Entry number 191395
keyword=2-daq setup notes
Per request of the Li/B experimenters, the 2-daq setup was
restored. The Left HRS DAQ runs on a-onl/adaql2 and the
Right HRS runs on adev/adaql1. This is how it was in summer 2006.
Instructions for DAQ :
hallaweb.jlab.org/equipment/daq/guide2.html
and more general info:
hallaweb.jlab.org/equipment/daq/guide.html
Notes:
1. I had to add 50 nsec to the gate time on L-arm to make the
ADC gate look good. Need to check if TDCs still in range.
2. Still to do: Re-establish the synch signal (if still desired)
and update the EPICS scripts.
3. Run numbers reset to avoid interference in MSS.