1) The rolling stairs attached to the RHRS (to get up to the hut) had their front feet 'down'. I stepped on the lever to get the wheels engaged so the stairs can roll freely.
2) There was a big 'U' tube on the floor just to the right of the spectrometer, up near the wall. It really looked like the drainage pipes at the rear of the spectrometer would snag it when the RHRS was moved. The ARM and I carefully picked it up and moved it to sit on the floor between the middle and outer bogies (at the same radius as the stuff on the floor to the left of the Left-HRS). Hope that was OK.
We should be ready to roll now.
A copy of this log entry has been emailed to: folts@jlab.org