• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Feuerbach

    Log entry time 01:36:43 on February15,2007

    Entry number 193277

    Followups:

    keyword=VDC efficiency

    Noticed that for run 6407 the VDC inefficiency was ~10% at the elastic peak, and the ratio of 5 hit:10 hit events had shrunk to 7:1.

    Dropped the beam current to 0.4 microamps, the limit where we still can see something from BPMB for run 6408.


    FIGURE 1

    FIGURE 2